Spec. Building
Baton Rouge, LA


General Contractor: Premier Design
Flatwork Contractor: Buchanan Concrete of the Carolinas

Approximately 25,000 CY of flatwork, tilt-up, and exterior paving. A portable plant was set up on-site producing concrete at a rate of 150+ cu/yds per hour. Pour sizes range from 100 yds. per day to 2,000 yds. per day.
 

Proctor & Gamble Distribution Center
Lima, OH


General Contractor: James N. Gray - Jim Wilkerson
Concrete: Ahal Contracting

Approximately 50,000 CY flatwork and paving.
 

Whirlpool Distribution Center
Orlando, FL


General Contractor: Exxcel Project Management, Columbus, OH
Concrete: Ahrens Concrete, Iowa City, Iowa

Approximately 25,000 CY flatwork, tilt-up and exterior paving.
 

Solo Cup Distribution Center
Social Circle, GA


General Contractor: Clayco Construction, St. Louis, MO
Concrete: Ahrens Concrete, Iowa City, Iowa


A joint venture between Mark Twain Redi-Mix and Tucco Concrete of Tucker, Georgia. In excess of 40,000 cubic yards of flatwork tilt-up and exterior paving.
 

Walgreens
Anderson, SC


General Contractor: Korte
Flatwork: Ace Avant - Michael Somero

Approximately 60,000 CY. This was a fast track project and high production rates were required. A portable plant was set up on site producing concrete at a rate of approximately 200+ cu/yds per hour. The flatwork pours ranged from 500 to 2,000 cu/yds per day.
 

Toyo Tire
White, GA


General Contractor: James N. Gray - Jim Wilkerson
Flatwork: Thesson Concrete

Approximately 40,000 CY. A portable plant was set up on site producing concrete at a rate of approximately 200+ cu/yds per hour. The flatwork pours ranged from 500 to 1,000 cu/yds per day.
 

Romark
Hazleton, PA


General Contractor: Whiting-Turner
Flatwork: WL Contracting - Tim Robinson

Approximately 28,000 Yds. Mark Twain Redi-Mix, Inc. set up a high production portable plant on site to supply all concrete for this project.
 

IKEA Furniture Warehouse - Phase I
Perryville, Maryland


General Contractor: James Gray Company, Lexington, KY - Jim Wilkerson

Approximately 38,000 Cu. Yds. High production portable plant was set up to supply all of the concrete for the project. The flatwork pours ranged from 700 to 1,000 Cu. Yds. a day, with production rates of 150 CY per hour.


IKEA Furniture Warehouse - Phase II
Perryville, Maryland


General Contractor: James Gray Company, Lexington, KY - Jim Wilkerson

Approximately 38,000 Cu. Yds. High production portable plant was set up to supply all of the concrete for the project. The flatwork pours ranged from 700 to 1,000 Cu. Yds. a day, with production rates of 150 CY per hour.
 

Ace Hardware
Petersburg, Virginia


General Contractor: James Gray Company, Lexington, KY
Flatwork: Ace/Avant, Archdale, NC

Approximately 800,000 sq. ft.
 

E-Toys
Blair, Virginia


General Contractor: Clayco Construction, St. Louis, MO
Flatwork: Great Southern Concrete Jonesboro, GA

Approximately 25,000 cu/yds. This was a fast track project and high production rates were required. A portable plant was set up on site producing concrete at a rate of approximately 200+ cu/yds per hour. The flatwork pours ranged from 500 to 2,500 cu/yds per day.
 

True-Serve
Hagerstown, Maryland


General Contractor: Clayco Construction,  St. Louis, MO
Flatwork: Vee Jay Cement, St. Louis, MO

Approximately 40,000 cu/yds. This was a fast track project and high production rates were required. A portable plant was set up on site producing concrete at a rate of approximately 200+ cu/yds per hour. The flatwork pours ranged from 500 to 2,500 cu/yds per day.
 

Harcourt Brace
Troy, MO

Contractors: Fenix Construction (Tilt Up Walls)
Ahal Contracting (Floors)

Interior flatwork pours were completed in four pours of approximately 500 cubic yards each. A laser screed was used and Mark Twain Redi-Mix was asked to supply 100 plus cubic yards per hour.
 

American Cyanamid
Palmyra, MO


Contractors: Carl Nelson Company Burlington, Iowa (Tilt Up Walls)
Ahrens Concrete, Iowa City, Iowa (Interior Flatwork)
Mike Nelson Concrete (Paving)

200,000 square foot building with tilt up walls. Job site was located approximately twelve miles from Mark Twain Redi-Mix's Hannibal plant. 150 cubic yards per hour were needed on the floor while the laser screed was being used. Trucks were brought in from other plants and the yardage needed was supplied.
 

6th & Cherry Street Parking Structure
Columbia, MO


Contractors: Paric Corporation, St. Louis, MO
Vee Jay Cement, St. Louis, MO

Approximately 3500 cubic yards, 5000 PSI concrete with a three day break of 3000 PSI was supplied. Trial mixes were produced to design concrete to meet specifications.
 

Northeast Correctional Facility
Bowling Green, MO


Contractors: J.S. Alberici, St. Louis, MO
Vee Jay Cement St. Louis, MO

Approximately 10,000 cubic yards. Numerous large pours were made at 100 cubic yards per hour up to approximately 350 yards.
 

Pillsbury Warehouse
Hannibal, MO


Contractor: Ahal Concrete, St. Louis, MO

Large slab on grade pours for interior floors. A laser screed was used by Ahal, Mark Twain Redi-Mix was asked to supply 150 plus cubic yards per hour which was accomplished.
 

Wilson Trailer
Moberly, MO


Contractors: Mike Nelson Company, Burlington, Iowa
Ahrens Concrete Iowa City, Iowa

8000 cubic yard job, large pours made on the interior flatwork using laser screed. 100 plus cubic yards per hour was supplied for flatwork and paving.
 

Mississippi River Bridge
Hannibal, MO


Contractor: Edward Kraemer & Sons Plain, Wisconsin

Approximately 36,000 cubic yards. Largest pour was 2,600 cubic yards continuous. Production rates exceeding 100 plus cubic yards per hour.
 

Everlast
Moberly, MO


Contractor: Prost Builders Jefferson City, MO

300,000 square foot metal building. A laser screed was used to pour the floor, pour sizes up to 450 cubic yards, Mark Twain Redi-Mix supplied concrete at approximately 100 plus cubic yards per hour.
 

Heilig Meyers
Moberly, MO


Contractors: Carl A. Nelson Company, Burlington, Iowa
Ahrens Concrete, Iowa City, Iowa

Approximately 450,000 square feet tilt up building. Large pours were made on the floor in the morning followed by pouring the tilt-up walls in the afternoon. A portable plant was set up on site and concrete was supplied to the job site at 100 plus cubic yards per hour.
 

Hubbell Distribution Center
Centralia, MO


Contractor: Synercon Construction Company, Columbia, MO

Approximately 20,000 cubic yards in the project. Mark Twain Redi-Mix set up a high production portable plant on site to supply all concrete for the project.